Gavita E-Series Bus Wiring – Interconnect Cable and Splitter for Ballasts
Gavita E-Series Bus Wiring – Interconnect Cable and Splitter for Ballasts
-
Connector: RJ14
-
System: Gavita E-Series Bus
-
Interconnection cable: 3 m (10 ft)
-
Splitter: 3-way
-
Power supply: Not required, daisy-chained
-
Weights: 0.15 and 0.08 kg (estimated)
Discover the benefits of the PRO CLUB
Discounts of up to -12%, priority shipping and more.
Easy returns within 15 days
No questions asked
Description
- 🔌 RJ14 E-Series Bus: System wiring that daisy-chains Gavita ballasts.
- 🎚️ Centralized control: Carries the signal from the EL2 Master Controller to each ballast.
- 📐 3 m cable: 10 ft interconnecting cable between units.
- 🔧 3-way splitter: Splits one bus output into three for non-aligned rooms.
- ⚡ No extra power supply: Connects in a daisy chain, from unit to unit.
The two pieces of wiring you need to set up the control bus for a Gavita room.
Full description
Wiring accessories for the Gavita E-Series RJ14 bus, the system that allows E-Series ballasts and luminaires to be daisy-chained and controlled from a single EL2 or EL2F Master Controller.
3 m RJ14 Interconnect Cable
10 ft (3 meter) cable for connecting one ballast to the next or to the master controller. It is the system's standard jumper cable: it connects in a daisy chain, from device to device, without the need for an additional power source.
3-Way RJ14 Splitter
Splitter that converts one bus output into three, to branch the installation when the ballasts are not aligned in a single row or when it is convenient to shorten cable runs.
Technical Data
- Connector: RJ14
- System: Gavita E-Series bus
- Interconnect cable length: 3 m (10 ft)
- Splitter outputs: 3-way
The published weights are estimates: Plantasur does not provide the official data for these references.
Warranty
At GrowIndustry we only work with proven quality products and trusted brands.
Every item goes through a check before shipping to make sure it arrives in perfect condition and ready to use.
Your satisfaction is our priority.
How to use
1. Turn off the power to all ballasts before wiring the bus.
2. Connect the EL2 Master Controller to the first ballast with an RJ14 cable.
3. Daisy-chain the remaining ballasts, one after another, using additional 3 m cables.
4. If the room is not aligned, insert the splitter to branch the bus.
5. Check that all connectors click into place and are secure.
6. Turn on the power and check the controller to ensure it recognizes all devices.

Gavita E-Series Bus Wiring – Interconnect Cable and Splitter for Ballasts
Join our exclusive club for regular customers and start enjoying unbeatable prices, VIP service and premium support for your grows.
Increasing discounts
From 2% to 10% on every purchase depending on your level
Free shipping before
From €39 for Bronze and no minimum for Platinum (up to 10 kg)
Fast deliveries
Free discreet packaging as a PRO CLUB member
Extended warranty
Up to 90 days to return depending on your level
Frequently asked questions
-
It is the system that lets you daisy-chain E-Series ballasts and fixtures and control them all from a single Master Controller. Without this cabling you cannot centralise the control of your installation.
-
The RJ14 interconnection cable is 3 metres (10 ft) long. It is the system's standard patch lead and is used to link one ballast to the next or to the master controller.
-
It is a splitter that turns one bus output into three. It is very useful for branching the installation when the ballasts aren't lined up in a single row or when you want to shorten cable runs.
-
It is designed for Gavita's Master Controller EL2 or EL2F. From that controller you run the whole chain of E-Series ballasts and fixtures.
-
No. The cable chains from one unit to the next with no need for any extra power supply, which simplifies the setup considerably.
-
It uses an RJ14 connector, the standard for the Gavita E-Series bus. Both the interconnection cable and the splitter share that same connection type.